ECS successfully completes AT&T’s 3rd largest DAS project in 2013-2014 at the University of Arkansas, Fayetteville, Arkansas campus. Venues include the Remote head-End location raw-land build, Razorback Stadium, Bud Walton Arena, Student Union, Health Physical Education and Recreation building and underground fiber network connecting the network.
Similar Posts
LTE Capacity
LTE capacity was the hot ticket in 2013 for AT&T & ECS was a key member in installation and integration of the 1600 site carrier add build out. Working in conjunction with AT&T and Ericsson to ensure success.
Hurricane Ike
AT&T was up in a helicopter taking photos and surveying the damage/sites and caught one of our crews in action – this was one of the first generators deployed to Galveston Island.